Located on the east bank of the Iowa River, the University of Iowa’s water plant is a trusted source of potable water for the University and for the surrounding hospital and clinics. Proper maintenance of the plant is vital to its continued efficient, sustainable, and safe operation. This project focuses on replacing the water intake portion of the plant, which includes a pump house on the river bank and the intake structure that sits in the river close to the bank.

A new intake structure and pump house will be erected upstream of the existing one, which was built in 1962. New piping will be installed to convey water into the plant. The new water intake is designed to minimize disruption to the riparian ecosystem, with particular focus on preserving the habitat of the Higgins eye pearlymussel (Lampsilis higginsii), an endangered species native to this region. Among the environmental benefits of the improved intake design will be a reduced impact on water flow around the intake components.

Land development along the Iowa River has made the pump house more susceptible to flooding. Flood-hardening measures will enable the facility to meet FEMA flood elevation requirements. The upgrades will also improve the facility’s aesthetic appeal, allowing it to blend more harmoniously into the waterfront landscape.

The upgrades will also deliver operational efficiencies and cost reductions. For example, plant staff currently spend many hours each winter manually de-icing and cleaning the intake screens to ensure optimal water flow into the plant. Automating this process will not only save time but also improve the safety of plant staff. The new intake is also designed for better protection from debris floating downriver, which will reduce repair costs during the useful life of the intake mechanisms. The upgrades are expected to be completed in early 2024, after passing all relevant permitting and environmental reviews required by the Iowa Department of Natural Resources and the U.S. Army Corps of Engineers.

Utility System Category: Water

Project Status: Design

Primary Benefits: Safety, efficiency/sustainability, reliability, cost reduction

Photo Gallery

Projects Portfolio

 

Learn more about the University of Iowa Energy Collaborative’s works in progress.
Check back here often as projects progress and new projects are added.

Newer Chillers Lower Temps and Costs
Category: Chilled Water | Phase: Construction

At the North Campus Chilled Water Plant, a new 25-year, high-capacity chiller will replace three smaller, aging chillers, saving hundreds of thousands of dollars in operating costs. In addition, piping upgrades will make the system more responsive to variations in cooling demand.

New Boiler Grate Enables Reliable Coal-Free Operation
Category: Steam | Phase: Construction

The University of Iowa depends on steam boilers to heat campus buildings and provide a portion of campus electricity. To ensure the reliability of a crucial boiler that has transitioned from coal to Convergen fuel pellets, the Energy Collaborative is replacing the grate and related equipment with more durable alternatives.